In short: Multan and much of south Punjab are supplied by MEPCO. Net billing applications go through the PITC Net Billing Portal (nmp.pitc.com.pk) with MEPCO selected. Unlike most other companies, MEPCO consumers are not sent to the ENC website for load extension. The portal directs them to the MEPCO Smart App, the PowerSmart App and eOps, or to their nearest customer facilitation centre.

A south-facing 10 kW system in Multan produces about 45 units a day, around 16,500 units a year, with strong output even in winter. Net billing for a 10 kW system with Solar Net Metering costs Rs 200,000 for MEPCO consumers.

Last updated: 21 September 2026. Based on the PITC Net Billing Portal, the ENC portal notice, the NEPRA (Prosumer) Regulations 2026 and PVGIS solar data. Sources are listed at the end.

Solar production in Multan

These are PVGIS long-term averages for Multan. The settings were a 10 kW system facing south at a 20-degree tilt, with 14% system losses.

Month Units per day (10 kW) Month Units per day (10 kW)
January 42 July 42
February 46 August 42
March 49 September 44
April 51 October 46
May 50 November 43
June 47 December 41

Multan’s output is one of the most even through the year of the cities we compared. January still gives about 42 units a day, well above Islamabad (about 36) and Lahore (about 37). Over a year, a 10 kW system produces about 16,500 units, about 5% more than in Lahore. That is more than Faisalabad, and a little less than Sukkur further south.

How to apply with MEPCO

  1. Check your connection. Net billing needs a three-phase connection and a sanctioned load of at least 5 kW. The solar system cannot exceed your sanctioned load.
  2. Change or extend your load through MEPCO’s own channels. The ENC portal’s notice tells all MEPCO users to use the MEPCO Smart App or PowerSmart App and eOps, or visit the nearest customer facilitation centre. The PITC portal gives the same direction.
  3. Check transformer capacity with the “Check Transformer Overloading” button on nmp.pitc.com.pk. Solar on a transformer may not exceed 80% of its rating.
  4. Apply for net billing on nmp.pitc.com.pk, as a consumer or through your installer, with MEPCO selected.
  5. Agreement, demand notice and meter. MEPCO reviews the case, signs the agreement and issues the estimate for interconnection and metering. After payment it installs the bidirectional meter. Systems up to 25 kW no longer need NEPRA’s concurrence (S.R.O. 1320(I)/2026); larger systems still need it before billing starts.

To check your MEPCO net billing application status, use “Search Application” on the portal with MEPCO selected, and your tracking ID, CNIC or reference number. Deadlines for each stage are in our complete guide to net billing in Pakistan.

Solar in Multan’s heat and dust

Reading a MEPCO net billing bill

Your bill lists imported and exported units separately. Imports are billed at your MEPCO tariff, and exports are credited at the national average energy purchase price, reported at roughly Rs 8 to Rs 11 per unit when the rules started. Solar units you use at home never reach the meter, so they do not appear on the bill. Our net metering bill explainer walks through a full example; the calculation is the same for MEPCO.

Frequently asked questions

How do MEPCO consumers apply for load extension?

Through the MEPCO Smart App, the PowerSmart App and eOps, or at the nearest customer facilitation centre, according to the ENC and PITC portal notices.

How do I check my MEPCO net metering application status?

Use “Search Application” on nmp.pitc.com.pk, select MEPCO, and enter your tracking ID, CNIC or reference number.

How many units does a 10 kW solar system produce in Multan?

About 45 units a day on average and about 16,500 units a year, with around 42 units a day even in January.

What is the MEPCO net metering unit rate?

Imports are billed at your MEPCO tariff; exports are credited at the national average energy purchase price, reported at roughly Rs 8 to Rs 11 per unit when net billing started.

How much does 10 kW net billing cost with MEPCO?

With Solar Net Metering, net billing for a 10 kW system costs Rs 200,000 for MEPCO consumers.

اردو خلاصہ

ملتان اور جنوبی پنجاب کے بڑے حصے میں بجلی میپکو فراہم کرتی ہے۔ نیٹ بلنگ کی درخواست PITC پورٹل (nmp.pitc.com.pk) پر میپکو منتخب کر کے دی جاتی ہے۔ لوڈ بڑھانے کے لیے میپکو صارفین ENC ویب سائٹ کے بجائے میپکو اسمارٹ ایپ، پاور اسمارٹ ایپ اور ای-آپس یا قریبی کسٹمر فیسلیٹیشن سینٹر استعمال کرتے ہیں۔ ملتان میں 10 کلو واٹ سسٹم روزانہ اوسطاً تقریباً 45 یونٹ اور سالانہ تقریباً 16,500 یونٹ بناتا ہے، اور سردیوں میں بھی پیداوار اچھی رہتی ہے۔ گرمی اور گرد کی وجہ سے پینلز کے نیچے ہوا کا راستہ اور باقاعدہ صفائی ضروری ہے۔ میپکو صارفین کے لیے 10 کلو واٹ سسٹم کی نیٹ بلنگ 2,00,000 روپے۔